CASE STUDY 1: THE PERSONNEL MANAGEMENT INFORMATION SYSTEM (PMIS)The Functions of Personnel Management Office (PMO) and Public Service Commission (PSC) PMO is the central human resource (HR) management and planning department for the Gambian civil service. As a department it was (in 2000 through 2002, the period to which this section of the paper refers) headed by a Permanent Secretary (PS). The PS reported to the Secretary General, who as head of the Gambian civil service, was answerable to the Office of the President. PMO had responsibility for maintaining information on the staff of approximately 11000 full time civil servants as well as a number of people employed on a daily wage basis. All Gambian teachers in state schools were civil servants as were most nurses and other medical staff. The PMO staff were themselves civil servants. A number of other state employees also existed though apparently outside PMO's immediate management orbit. These included groups such as the police, army and certain health workers. PMO handled the administration of all civil servants career developments, ensuring that they followed the correct procedures and defined rules. Amongst PMO's other functions were the development of a civil service grading structure, the definition of different career cadres within the civil service, setting the rules governing qualifications needed for different cadres and the terms for promotion, etc. PMO also managed the training programmes for civil servants including the training budget. Payment of civil servants was not PMO's responsibility but PMO did liaise with the Accountant General's department on payroll issues. Crucially, PMO's procedures and operations were in turn supervised and scrutinised by an independent body, the Public Service Commission (PSC), comprising a chairman, deputies, and a full time secretary. The PSC functioned as an appointed board, separate from the civil service procedures. All civil service applicants had to be approved by the PSC; any decision relating to a civil servant made by PMO had to be referred to, and ratified by, the PSC.
ObjectivesThe PMIS was designed and installed sometime around 1998 -1999 but it was in fact never seriously used by PMO's staff who viewed the data it held with suspicion. By September 2000, on arrival of the author, all documentation relating to its design and implementation, if in fact any had been produced, was missing. The objectives assigned to the author were:
Developing a set of simple operating procedures was not per se a difficult task though explaining the need and persuading the PMIS operations staff to adopt them was less straight forward. However, the occasion of a fire in an adjacent department with the loss of a very large amount of paper-based information, did serve to demonstrate the value of disaster recovery planning and management procedures! It rapidly became evident that there were other, more difficult problems, to solve:
These problems were closely linked.
Information Management wthin PMOIn the year 2000 PMO held information on all full time appointed civil servants within its jurisdiction in two separate formats:
Paper-Based Filing System - For each civil servant PMO maintained a file containing the accumulated information relating to his or her career progression, the so-called P-file. The P-file should, according to agreed rules, contain all PMO and PSC official papers relating to the individual. As a minimum they include: birth certificate (to verify age), original application form, documentation covering educational achievement and qualifications, copy of letter of appointment, 'confirmation in appointment' (when applicable), copies of all correspondence between PMO and the civil servant e.g. relating to promotions, career changes, disciplinary matters, etc. Digital Records in Database - The database was apparently designed to hold information similar to that in the P-file system though it made no provision either for storing or referencing any of the correspondence. The main personnel records were modelled on the civil service 'Application for Employment' form though the database also made provision for some additional records covering career progression, time spent on secondment, and other significant events and episodes. Some areas of the data structures employed were poorly designed (indeed reflecting the employment application form!). In particular, the education and training sections were quite inadequate either for recording meaningful data or identifying individuals with specific characteristics and competencies. DfID had paid for hardware and software in the form of an aid/grant to PMO. The ostensible reason for introducing a database was to improve 'good governance' by improved record keeping procedures. PMO staff stated that a European Consultancy Group had implemented the database. However PMO had neither records identifying the "Consultancy Group" nor how they had been selected and appointed. No background information was available within PMO explaining how the system had been conceived or by whom. No written details or specifications relating either to the planning and design of the database, or to its testing and hand-over, existed within PMO. There was, crucially, no information suggesting that any ideas relating to its intended usage had ever been discussed with PMO's management or staff. Apparently no thought was given to the purpose and role of the database system within the PMO organisation, nor on its impact on PMO's method of working. This is a major cause for the system remaining virtually unused by PMO, effectively becoming a complete 'white elephant'.
System Configuration & OperationThe system was based on four or five Personal Computers (PCs) linked using a peer-to-peer network and housed in a special air-conditioned office. The database was implemented as a conventional relational database scheme using Microsoft™ Access™. The system was run by a relatively senior civil servant as manager, a deputy who handled the technical aspects, and two data entry clerks. The system, including staff, was initially known as the Human Resources Information System (HRIS) but later renamed the PMO Management Information System (PMIS) to align it with the EMIS, HMIS and other planned Gambian government MIS schemes.
Data Collection and InputAfter development of the system a major exercise was undertaken by PMO, primarily HRIS staff, to acquire and enter the personnel data. To gather the data HRIS produced a questionnaire requesting civil servants to supply the information required. PMO staff then travelled around the country, visiting every civil servant at their place of work, explaining the issue, and getting them to complete the questionnaires. The data entry clerks then entered the resulting data into the HRIS database. Several problems arose from this procedure resulting in numerous, serious discrepancies between the PMIS and P-file data:
Failure to Incorporate PMIS in Working ProceduresThe operational procedures within PMO were never changed to make use of the PMIS database; paper files continued to be used for all PMO's work. When occasionally the PMIS was interrogated differences frequently existed between PMIS and P-file information. PMO's staff were familiar with the P-files with their information in written form. They regarded the P-file information as accurate and thus the PMIS data as unreliable. This became one of the nails in the PMIS coffin: Why use suspect data when (apparently) accurate information is at hand? Later, when PMO were persuaded to carry out a verification exercise checking both the P-files and the PMIS database against reality, it was discovered that there were serious discrepancies in the paper system's information too. In fact the database information was, in general, much more accurate than the P-files! (A lot of bad filing and bad records practice, e.g. letters with wrong or quite commonly, completely missing references, had resulted in an accumulation of errors in the P-files over many years; errors of which the PMO staff had been quite unaware!) Data Changes and Update ProceduresThe personnel data was, of course, not static. Civil servants change their roles quite frequently. Those changes had to be reflected in the PMIS to maintain its accuracy. However the PMIS was not used in any meaningful operational way for making decisions on individual civil servants and the changes in their careers. Instead, decisions were based on information laboriously dredged from the individuals P-files. The decisions were then communicated to the person and a letter sent as confirmation with a copy placed in the P-file as a record. The procedure for updating the PMIS database was separate. A copy of every letter written in PMO was included in the so-called 'running-file' and circulated to all managers within PMO including HRIS. Each week the HRIS data entry clerks sifted through the current running-files and used the relevant letters to update the PMIS. As a result the PMIS was always at best one or two weeks out of synchronisation with reality. There were no checks on the update procedure. It was not difficult to miss one or more letters in the running-file or to transcribe the information incorrectly. Moreover there was no certainty that the running-file was itself complete, thus increasing the risk of inaccuracy of the PMIS. The Data Access ProblemsThere were two very serious problems concerned with PMO's general staff accessing the PMIS data and these taken with the ones already discussed almost certainly rendered the overall system as originally conceived effectively useless:
PMO staff were very busy, indeed generally overworked, and the idea that they might take time out to visit HRIS to learn how to use the PMIS (which, as previously explained, most staff believed held flawed data) was totally unrealistic. It did not happen. Some senior staff who had come across databases while studying abroad did occasionally make requests, particularly relating to statistical information, but the overall use was extremely low. It appeared that, generally, staff had no understanding or interest in the capabilities of the PMIS system. Planned System UpgradesThree major changes were proposed for the PMIS which, taken as a whole, formed a realistic attempt to demonstrate that the database could in fact be a very useful asset to PMO, speed up the work done, and improve the quality and accuracy of PMO's output:
The upgrade scheme was designed to show how the PMIS might benefit PMO's operations without seriously disrupting PMO's way of working. The long-term objectives were for the PMIS to gradually take over increasing amounts of PMO's workload. It would be quite feasible to develop the PMIS to handle many of the routine tasks. Every decision made by PMO (and the PSC) currently involves numerous movements of files amongst members of staff and management, and each movement has to be recorded. PMO's arcane procedures could be greatly simplified and the time to make decisions greatly reduced. It would also permit the redeploying of many of PMO's staff to other tasks where their abilities might be better used. The first essential step, however, was to build confidence in the PMIS's capability amongst PMO's management and staff. Only then might it be practical to introduce more sophisticated human resource management objectives. The proposed upgrade plan needed additional investment. No money was available from PMO resources but a small grant was provided by DfID enabling a pilot project to demonstrate the PMIS's ability to create standard format letters while simultaneously updating the database. This did however not resolve the real problems of PMO staff access to the PMIS, nor did it provide the training in database use or explain its capabilities. The PMIS thus inevitably remained unused, a wasted asset.
CASE STUDY 2: THE EDUCATIONAL MANAGEMENT INFORMATION SYSTEM (EMIS)Introduction to DoSEThe Department of State for Education (DoSE) is responsible for all facets of education within The Gambia. It includes over 700 schools with over 6,000 teachers providing education from primary up to university level. Major issues facing the Department in 2000 included:
Project OutlineDfID has a history of supporting the development of the education sector in The Gambia. As part of this development an Education Management Project (EMP) was inaugurated in early 2000. This project was extensively researched and discussed with DoSE senior management when it was being designed. It had a planned duration of two years and specifically targeted the management of the sector through:
This paper is primarily concerned with the EMIS component of this project and does not consider the staff appraisal aspect although this encountered very similar difficulties. The project team comprised:
The team was supplemented by a Systems Analyst from VSO and by local staff who received more training under the project. The DoSE Information Technology and Human Resource Department (ITHRD) had previously commenced work on an EMIS. The EMP Team Leader's report of this aspect in April 2002 stated:
A work-plan was produced for the System Designer and Systems Analyst and this was, in general, executed as planned:
The resulting EMIS product was distributed on a CD that included the necessary procedures for installation on user PCs. It was intended to provide a comprehensive, accumulating statistical view of the education system in the country. It did not provide for end-user feedback of amendments and corrections. System ComponentsThe system was composed of the major data elements shown in Table 2:
Table 2: Major data elements
ReportingExtensive reports at establishment, regional and national levels including analyses by age, gender, grade and school type. Statistics included Gross and Net Enrolment Rates, Pupil/Teacher ratios, promotion and drop out rates in accordance with international definitions. Technical OverviewEMIS was developed in Microsoft™ Access™ (version '97 and 2000) being used so as to provide compatibility with the versions of this software currently in use within DoSE. The GIS component was produced with MapInfo. There are a number of different functional components involved in the production process:
The two data entry systems were operated separately from the master version of the data. Once data entry was complete the Operations Database managed the loading of the new data into the master version. The final product, the two data entry systems and the operations database all had a similar structure in terms of a front-end database and a core database that are joined by the "Linked Table Manager" in a way that is transparent to the users. Project ImplementationUnder the direction of the System Designer most of the work was carried out by the VSO System Analyst who in turn directed a Peace Corps volunteer (who developed the GIS component) and two Gambian Systems Analysts who had been trained in Microsoft™ Access™ under the project. Development PeriodDuring the active life of the project (i.e. until March 2002) the system was developed broadly in accordance with the work-plan and the system design as modified in the light of user feedback.
In March 2002 a formal ceremony marked the end of the development project and the departure of the team members.At that point the status of EMIS was:
Post Project PeriodThe closing ceremony proved to be a high water mark for the system. Over the next two years there was a progressive decline in the staff situation within DoSE and especially with the EMIS team. Generally the management staff levels across DoSE were well below the establishment figures with the more competent individuals being moved around according to changing priorities. In the EMIS team individuals trained under the project were either moved away or left as soon as they could at the end of the bonding period associated with their training 3. The remaining development team were heavily occupied in the routine operation of the system and operational problem solving which left inadequate time for new development. Software problems were encountered with various statistical production modules within the system and these proved too complex for the existing staff to correct. Recruitment of suitable replacement staff proved impossible because of management reluctance and, even more significantly, because of the lack of suitable candidates. The Gambian education system, like many other countries in Sub Saharan Africa, is heavily based on rote learning and positively militates against constructive thinking:
Management of the EMIS during this time was provided by another VSO volunteer (the author of this section) who was supposed to act as an Advisor in support of a Gambian departmental manager. However the person eventually appointed for the latter role was fully occupied with other ICT activities and took no part in EMIS. When the author departed in January 2004, in the week of his departure a Gambian with minimal experience was appointed to take on those responsibilities. Therefore no proper hand-over or training was possible. The power supply throughout the country worsened progressively with particularly significant impact in the regional offices with negative consequences especially on the postings process (see section 3.63 below). Funding had been allocated for fuel for a generator for the DoSE building in which EMIS is based but these funds were often not made available for that purpose. The equipment maintenance situation deteriorated progressively. The local maintenance organisations are of limited ability and capacity. Minimal funding was identified for maintenance in annual budgets.
Data CollectionThe annual data collection exercise was a critical part of EMIS since it was the source of the majority of data loaded into the system. The key element was the completion of a 14-page form by the principal of each educational establishment covering detailed enrolment figures and the establishment facilities. Training was provided each year for school heads in each region to equip them for this exercise. Each year different methodologies have been used for the issuing, collection and validation of these forms. No satisfactory and cost-effective approach has yet proved successful in terms of the speed, completeness and accuracy of form completion. Although head teachers had the importance of this process explained to them each year, they saw little if any direct benefit coming to them or their schools and consequently they often lacked motivation and delegated the task to less appropriate individuals. The resulting forms required extensive validation before data entry.
PostingsThe annual process of allocating teachers to schools was identified as one of the principal ways in which EMIS could provide benefits to DoSE management. To date this has not proved to be the case mainly because of operational difficulties that have made the relevant information available to the Postings Committee either too late or in incomplete form. The failure of EMIS to provide real benefits in this respect handicaps the reputation of the system within DoSE management.
Observations
CASE STUDY 3: THE HEALTH MANAGEMENT INFORMATION SYSTEM (HMIS)IntroductionThe Department of State for Health and Social Welfare (DoSH&SW) is responsible for providing health care to the people of The Gambia. Delivery of health care has been focused at the primary level, that is, within the community itself with village health workers and community health nurses providing key health services to the public. Secondary and tertiary services were provided by 4 hospitals and approximately 40 health facilities with more than 500 health posts at the primary level though there were also facilities provided by private and Non-Governmental Organization (NGO) clinics. The "Mission Statement" of DoSH&SW is:
DoSH&SW was aided in the provision of these services by ICT equipment scattered in offices and health facilities throughout the country. Most of this equipment was donated to the department or acquired by funding agencies such as the World Health Organisation (WHO) and the United Nations Children's Fund (UNICEF). Some equipment was also purchased using credit from organisations such as the World Bank. In the past most of this equipment was used for basic word processing and spreadsheet purposes with little consideration of their use for more advanced analytical and planning purposes. In recent years there has been an increasing demand for accurate health information on which to base sound decisions. Previous decisions were made based upon surveys with limited applicability or by "generally accepted" situational analysis. The information necessary to make effective decisions was simply not available. It was accepted that ICT could potentially play a significant role in this effort and it was further hoped an effective Health Management Information System (HMIS) would be able to provide this information.
Project History and OverviewThe need for a HMIS was initially recognised by a survey undertaken by the Management Sciences for Health organisation in 1994 (MSH, 1994). The African Development Bank funded this initial survey but specific HMIS funding was not secured until 1998. At this point the World Bank funded Participatory Health Population and Nutrition Project (PHPNP), a five year project (subsequently extended), identified the HMIS as part of its efforts towards "…improving the quality of, and access to, family health services, including reproductive, infant and children health services, nutrition services, and the management of such services in The Gambia" (PHPNP, 1998). PHPNP included HMIS as part of its "Capacity Building and Policy Development" (Component IV, "Management and Implementation of a Family Health Project", sub-component 1). PHPNP identified the following as components of the HMIS:
Since the initial PHPNP proposal various events occurred that caused adjustment to the scope of the HMIS including:
Project FocusThe HMIS had the advantage of being implemented after the initial attempts at establishing MISs by PMO (PMIS) and DoSE (EMIS). In conversations with key individuals involved in the development of these systems a number of critical issues linked to their perceived failures were identified. These conversations and other influences caused the HMIS implementers to re-consider their activities with regards to the following:
Establishing the Core Infrastructure for HMISTo identify the state of ICT within the department an initial assessment of all ICT resources (both computer equipment and personnel) was performed. This assessment was used to determine what specific activities needed to be carried out to establish the fundamentals for the HMIS. The activities identified included:
Establishing the HMISEarly in the planning process it was seen that a central repository for all HMIS data would be required. This repository would allow any system requiring DoSH&SW data to easily access it. It was determined that this database would have to be capable of handling multiple concurrent access but with budgetary considerations commercial products such as Sybase SQL Server and Oracle were not seen as viable solutions. After long discussions the Open Source database server software MySQL was chosen and implemented. This database was eventually populated such that it contained the core set of information for future (and existing) HMIS components. After the core database was implemented, basic versions of the following components were implemented and were largely operational at the end of the author's services:
A number of components of HMIS were yet to be implemented including: Vital Registration - This component would be used to store key information regarding the registration of births and deaths. The Births and Deaths Registration Unit were managing this process and, while they had computer equipment, it was largely unused as all information gathered by the unit was being entered manually into large registration books. This system led to widespread abuse and inconsistencies in the data. Due to political issues this component was not developed but was awaiting direction from senior management. Recently a proposal was put forward to fund the creation of a Vital Registration system as part of the United Nations Economic Commission for Africa (UNECA) African Information Society Initiative (AISI) framework (adopted by African Countries in 1996) however the outcome of this has not been revealed. Logistics - This component was envisaged as containing a complete inventory of all medical equipment as well as maintenance scheduling facilities. This component was only partially implemented by the end of the authors time with all ICT equipment existing in an inventory database along with management of any problems related to that equipment. This information was used to derive key statistics for future ICT resource planning. The aspects of this component related to medical equipment were not yet implemented with no future plans for their development in place. This was partially due to the fact that the key local staff member involved with and driving the implementation had left the service before the system could be completely specified and implemented.
Current Status of Project PersonnelThe current HMIS Consultant and the VSO systems analyst assisting her have now both left the country. There was hope that the time allotted would be sufficient for this role of establishing the firm foundation for future development however it seems that this is not the case. It should be noted that since their departure both consultants have continued to support the HMIS by providing support via the telephone and electronic mail. It is hoped that these continuing efforts will in some small way sustain the foundation that they have helped establish.
DifficultiesA number of critical issues were identified throughout the development of the HMIS including:
OBSERVATIONS AND DISCUSSIONSSeveral issues can be identified as being common to the design and implementation of these three systems as described above:
There are a number of factors that can be seen as critical for project success: (1) Understanding Cultural and Contextual Differences is KeyIn The Gambia the poor quality of the educational system was often ignored which led to a "developed world" solution being implemented in an immature management context. The three authors have come from cultures in which ICT has been introduced slowly over time and integrated into the society as a whole. In developing countries to implement advanced technological solutions without this cultural context is irresponsible and most likely to lead to failure. It must not be assumed that the recipients understand or appreciate the impact of the system being implemented. This "technological cultural gap" cannot be addressed by simply training individuals in the use of technology but there must also be a gradual sensitisation process whereby an appreciation for the cultural impact of technology is made clear. Technology is not simply a matter of computers it is also a state of mind -- an entirely new way of thinking. It should also be understood that in many ways managerial staff in developing countries are likely to agree to anything proposed by ICT implementers for numerous reasons relating to aid dependency and perceived expertise on the part of the ICT professional. There should be concerted effort to ensure that the recipients understand the full ramifications of the project. (2) Long Term Project SustainabilityIn many cases a project is implemented by a funding organisation over a fixed duration after which the project is considered complete. Before embarking on an ICT project serious thought must be given to the long-term sustainability of the project once it has been completed. Development projects funded by donor agencies normally specifically exclude running costs such as:
Therefore the project should address these matters by ensuring that senior management recognise this issue and that adequate provision is made in the budgetary process for the new system. This is an area in which senior management will often say that provision will be made at the start of the project but financial constraints are often imposed during the budgetary process. These recurrent costs are not perceived as being ‘mission critical' and are often therefore dropped. There is a common belief that ‘some other donor' can be found to fill the resulting gap when something breaks down.
PROJECT IMPLEMENTATION GUIDELINESBased upon their experiences, the authors would like to propose the following guidelines for successful MIS implementation in developing countries such as The Gambia. It should be noted that this section is not intended as a comprehensive project management manual but identifies aspects that require particular attention in such environments. (1) Project PlanningDuring the planning process for the project there are a number of factors that should be considered: (2) Ensure Project ApplicabilityIt may appear obvious but there needs to be a true understanding of the needs of the recipient and any proposed system must address those needs. It is possible to implement a system in a country with little regard to whether or not the country such a system serves any useful purpose. While it is true that the donor may have its own reasons for wanting the system, this should be weighed in light of the real and practical needs of the recipient. Where the donor has a particular set of requirements for the system these should take into account the needs of the recipient as well adjusting to the local requirements. (3) Realistic ScopeA realistic scope and time-scale for the project should be identified and communicated to all key players. There is always a pressure when funded by large agencies that the project achieves (or is perceived as achieving) the most within the budgetary constraints. This temptation should be weighed in light of the likelihood of the long-term success or failure as well as the value of the project to the recipients. The needs of the recipient should be balanced with the needs of the funding agency. It should be seen that it is in the best interests of the donor to see to it that the project is a success and, therefore, take necessary steps including the narrowing of scope to ensure that this is so. (4) Management Commitment to Project SuccessEnsure that there is genuine management commitment to the successful implementation of the project. There should be no assumptions made of their knowledge of ICT issues. It is essential to ensure the necessary understanding exists before soliciting key decisions. It may be necessary to consider the training of key individuals in management issues so they are more capable of making appropriate business decisions. (5) Clear Project Goals and Success IndicatorsAll parties should understand what the goals are of the project and clear indicators for project success should be developed. Such understanding by the recipient agency middle management should be to the level of being able to explain to others what these are in their own words instead of repeating simply the terminology and phrasing laid out in the project documentation. There should be a focus on the real understanding and appreciation of the impacts the project will bring to the recipient. (6) Long-term Financial PlanningThe financial planning of the project will naturally include all identifiable items during implementation. The project costs should reflect the additional sensitisation and consequent longer project duration than would be appropriate in western circumstances. However from the very beginning attention should also be given to the long-term financial sustainability of the project with efforts focused on obtaining long-term funding for the recurrent expenditures required after successful project implementation. The inclusion of such expenses into the budget may include lobbying and negotiating for necessary budget funding or talking to other long-term donors. This process can, potentially, take a considerable amount of time (perhaps even the duration of the entire project) so efforts should be made to start this as early as possible. The financial management of the project should be paramount. The adoption of separate bank accounts, not under the control of the recipient, should be used to fund the project 5. Similarly, the provision of ring-fenced funding 6 to cover the various ongoing costs of running the finished system and its further development should be given serious consideration.
PROJECT IMPLEMENTATIONPhased ImplementationEnsure that projects are implemented in a step-by-step manner with clear and achievable goals in each phase. These goals should be associated with the identification of easily quantifiable indicators. All parties should have a clear understanding of these goals and be continually striving towards their achievement. Each phase of the project should thus result in a system that demonstrates functional benefit to the recipient's management and staff. Implementing a project using the "big bang" is a recipe for disaster particularly when the lack of cultural understanding identified in the previous section. If possible the decision as to whether or not to proceed to the next step of project implementation should be based upon the confirmation that the previous step has been successfully implemented. Continual checks and balances should be made throughout the implementation of each phase with adjustments made as necessary to ensure successful implementation. It may be possible to link the achievement of the goals of each particular phase to financial incentives to stimulate this process.
On-Going Training and SensitisationBefore and throughout the implementation, training should take place for all relevant recipient agency staff in the use of the MIS as an adjunct to their working procedures . This includes technical personnel, management and system users. This training should be accompanied by project sensitisation sessions to ensure widespread understanding of the system and the benefits it will bring. Often such sessions are left until after the project has been implemented but this may cause resentment in that the system is implemented seemingly "out of nowhere" with little consideration given to the potential users. Appropriate sensitisation should also be provided for other staff members (e.g. secretaries, filing clerks) who have no direct contact with the system but whose working practices will be affected. Organisational Change Management UnitA dedicated Change Management Unit should be created within the organisation to control the impact of the new system on working practices. This would be used for attempting to ensure the successful implementation of the project but could also be useful for the development of management skills within the recipient agency and subsequently for other, non-project related activities that could be more effectively implemented. The perception may be that such a unit would slow project implementation down. While this may be true such a unit could ensure the long-term sustainability of the project and, therefore, the associated goals. This unit could serve as a training unit for people in change management techniques beginning with one individual trained in such techniques passing these skills onto others in the unit. Were such a unit to be proposed it is essential it is mandated and facilitated by the recipient agency itself. Without this involvement it is unlikely that such a unit would survive past project implementation.
Project Implementation ChecklistIn summary, the following is a checklist of the attributes that must be a part of any successful project implementation:
CONCLUSIONSIt can be seen in this paper that there are two fundamental issues:
Notwithstanding these difficulties however, the authors are satisfied that ICT projects, correctly implemented, with due regard for sustainability and staff training, can yield very significant benefits in in LDCs. Much of the development needed in LDCs would greatly benefit from access to, and effective analysis of, information. Each of the three schemes discussed, if correctly implemented and applied, had the potential to yield clear benefits in terms of improving the efficiency of the departments concerned whilst reducing reliance on scarce, trained and skilled, staff resources. The "phased" approach suggested in the "Project Implementation Guidelines" goes a long way towards anticipating these requirements and addressing the related issues. Much of the information access and analysis can only realistically be achieved by ICT. The shortage of educated and skilled staff has been flagged as a specific problem for development of ICT schemes but it is equally a serious factor in virtually all areas of administration, business and industry in The Gambia. The introduction of soundly planned ICT systems does therefore provide a possible means of employing scarce resources more efficiently and benefiting the country's economy. Finally it should be noted that, although many difficulties arise with the introduction of ICT in The Gambia this does not reflect hostility towards technology in general. As in so many Sub-Saharan LDCs, the wide acceptance of cars and motorised transport, and, even more recently, the extensive adoption of mobile telephones in The Gambia is clear evidence of this. This demonstrates that, when people in The Gambia perceive a benefit that is readily available, they are quick to take advantage of new ideas and, very importantly, develop the infrastructure necessary to support that technology. For ICT to become accepted in The Gambia, its benefits too must be adequately explained and it must be made available in a usable and sustainable form. REFERENCESDfID, 2003: - " Development Assistance Committee (DAC); Donor ICT Strategies Matrix; CD-Rom, 2003 Edition"; Internet: http://www1.oecd.org/dac/ictcd/htm/matrix_gbr.htm4. 1 March 2005. DoSE, 2002: - "Education Management Project April 2002 Initial Assessment of Data Management", Department of State for Education, April 2002. DoSH&SW, 1994: - "An Appraisal and Specifications for a Design of Health Management Information Systems in The Gambia", Management Sciences for Health (Hillard Davis, Sjoerd Postma), April 1994 DoSH&SW, 1998."Participatory Health Population and Nutrition Project (PHPNP) Project Operations Manual (POM)", October 1998. DoSH&SW, 2001."Changing for Good: Health Policy Framework", Department of State for Health and Social Welfare; Internet: http://www.dosh.gm/docs/hmis/HMIS_Policy.pdf, September 2001. DoSH&SW, 2002. "Health Management Information System Policy", Department of State for Health and Social Welfare; Internet: http://www.dosh.gm/docs/hmis/HMIS_Policy.pdf, 2002. MSH, 1994. "An Appraisal and Specifications for a Design of Health Management Information Systems in The Gambia", Management Sciences for Health (Hillard Davis, Sjoerd Postma), April 1994. PHPNP, 1998. "Participatory Health Population and Nutrition Project (PHPNP) Project Operations Manual (POM)", October 1998. SIDA, 2003. "Country ICT Surveys, June 2003"; Internet: http://www.sida.se/Sida/jsp/polopoly.jsp?d=321&a=9481, 1 March 2005. UNDP, 2003. "Human Development Report 2003, Millennium Development Goals: A compact among nations to end human poverty" downloaded from internet UNDP 2004: - "Knowledge Management Training ‘Information and Communication Technologies (ICT)"; Internet: http://www.sida.se/Sida/jsp/polopoly.jsp?d=321&a=9481, 1 March 2005. UNESCO, 1997. "International Seminar on Basic Education and Development Assistance in Sub Saharan Africa; Basic Education in Africa". Aïcha Bah-Diallo, Director, Division of Basic Education, UNESCO; Internet: http://www.jica.go.jp/english/resources/publications/study/topical/subsahara/keynote_01.html, 3 March 1997. WB/IRMT, 2003-4. "A Discussion on Electronic Government; An electronic discussion on E - Records Readiness and Capacity Building". See http://www.irmt.org/evidence/wbforum.html. Summary document authored by Andy Lipchak and John McDonald; Internet: http://www.irmt.org/evidence/wbediscussion.html, 1 March 2005. Notes1 The country's official name is 'The Republic of The Gambia'; the colloquial name 'The Gambia' is generally accepted and will be used in this paper. 2 Formerly Voluntary Service Overseas (VSO). Cf. http://www.vso.org.uk 3 "Bonding" is the process of contractually obligating civil servants so that they must continue employment within the government (or even, more specifically, their department) for a specified duration. 4 It should be noted that although the telephone system was generally well-developed government departments were frequently cut off because of non-payment of bills. 5 It is acknowledged that the setting up of such bank accounts may be difficult as demonstrated by the "Drug Revolving Fund" within DoSH&SW which required an act of the National Assembly before it could be implemented. 6 Funding that is allocated for a specific set of activities.
Copyright for articles published in this journal is retained by the authors, with first publication rights granted to the journal. By virtue of their appearance in this open access journal, articles are free to use, with proper attribution, in educational and other non-commercial settings.Original article at: http://ijedict.dec.uwi.edu//viewarticle.php?id=67&layout=html
|